Decision-first flow
Review one cost-sensitive category at a time.
Move from structure and openings into finish-heavy allowances without losing your place in a long specification sheet.
Premium comparison studio
Compare structural commitments, allowance ceilings, and visible finish upgrades in a calmer, category-led flow designed for premium home consultations.
Decision-first flow
Move from structure and openings into finish-heavy allowances without losing your place in a long specification sheet.
Recommended band
The layout keeps the most balanced package visible so upgrades and price jumps are easier to explain to homeowners.
Material clarity
Each category isolates the rows that usually change visual finish, lifecycle durability, or the final quotation value.
Comparison Studio
The comparison module below keeps every category focused and readable on desktop and mobile, while the recommended tier stays visually anchored throughout the experience.
Package Explorer
Recommended plan: Premium ProThis flow takes cues from premium pricing and comparison layouts: lead with a clear benchmark, surface the critical numbers early, and only open deeper specification detail when a client needs proof.
Active brief
Start here for the cost-critical decisions: structure, wall thickness, slab depth, and primary material commitments.
Why Premium Pro leads
For most families who want stronger finish allowances without jumping straight to a luxury-heavy budget.
Active category
01 / 09
Line items
25
Key differences
8
Popular plan
Premium Pro
Price gap
₹500
Detailed Comparison
Category 01Start here for the cost-critical decisions: structure, wall thickness, slab depth, and primary material commitments.
| Specifications | Essential BuildPremium₹2,299 | RecommendedPremium Pro₹2,399Most Popular | Premium Finish BandPremium Max₹2,799 |
|---|---|---|---|
Fully Framed Structure | Yes | Yes | Yes |
CementKey Difference | JSW / Equivalent | Ramco / Equivalent | Ultratech / Equivalent |
SteelKey Difference | Indrola 550D / Equivalent | Pulkit 550D | Tata Tiscon 550D |
BricksKey Difference | Engineered Flyash Bricks | Wirecut Red Bricks | Wirecut Red Bricks |
Ceiling HeightKey Difference | 10 Ft | 10 Ft | 11 Ft |
Basement HeightKey Difference | 2.5 Ft from Gr. Level | 3 Ft from Gr. Level | 4 Ft from Gr. Level |
Basement Depth | 7 Ft / Till Hard Layer | 7 Ft / Till Hard Layer | 7 Ft / Till Hard Layer |
M Sand | Brickwork | Brickwork | Brickwork |
P Sand | Plastering | Plastering | Plastering |
Exterior Walls | 9 Inches | 9 Inches | 9 Inches |
Inner Walls | 4.5 Inches | 4.5 Inches | 4.5 Inches |
Roof Concrete SlabKey Difference | 5 Inches | 5 Inches | 6 Inches |
Lintel Concrete | Full Lintel | Full Lintel | Full Lintel |
Sun Shade Concrete | 2.5 Inches | 2.5 Inches | 2.5 Inches |
Sil Concrete | Yes | Yes | Yes |
Anti Termite | Yes | Yes | Yes |
P.C.C Grade | M10 | M10 | M10 |
R.C.C Grade | M20 | M20 | M20 |
Weathering Course | Stone Chips Flooring | Stone Chips Flooring | Stone Chips Flooring |
Earth Filling | Gravel | Gravel | Gravel |
Loft & Shelf | One Per Room | One Per Room | One Per Room |
Parapet WallKey Difference | 2.5 Ft Ht | 6" Thick | 2.5 Ft Ht | 6" Thick | 2.5 Ft Ht | 9" Thick |
Window Grills | Mild Steel | Mild Steel | Mild Steel |
Compound GatesKey Difference | Mild Steel | Mild Steel + HPL | Stainless Steel + HPL |
Railing | MS / SS | MS / SS | MS / SS |